1941 Boilermaking Part 5 – Steam PoWeR - reprint

$13.98
condition
New

Boilermaking Part 5, ICS # 2171-E, by C.B. Lindstrom, published International Correspondence Schools, Scranton, Pennsylvania, 1941. Reproduced by Nation Builder Books, Mebane, NC, 2024, 5½ x 8½ photocopied booklet, 56 pages.


Please note this is a new photoduplicated reproduction, not an original

Contents:

Fabricating Processes (continued)

Chipping and Calking

Chipping Chisels….

Chipping With Pneumatic Hammer

Purpose of Calking

Calking Rivet Heads

Staying and Bracing

Installation of Rigid Staybolts

Table I—Proportion of Taper-Head Crown Staybolts

Table II—Proportion of Water-Space and Radial Staybolts

Tube-Installation Processes

Swaging

Suggestions on Tapping Staybolt Holes….

Tapping Holes in Narrow Water Legs

Installation of End-to-End Stays

Setting and Cutting Off Staybolts

Upsetting and Forming Staybolt Heads

Installation of Flexible Staybolts

Welded Sleeves for Flexible Stays

Alinement of Flexible Stays

Drilling Holes for Flexible Stays

Reaming Holes for Flexible Stays

Tapping Holes for Flexible Stays

Installing Sleeves of Flexible Stays

Table III—Change of Staybolt Length for Fractional Turns

Bracing

Applying Diagonal Braces

Fitting Jaw Braces

Installing Boiler Tubes and Flues

Definitions

Service Conditions Affecting Tubes

Tube Expanders

Roller Expanders

Combination Tube Expander and Flaring Tool

Expander for Arch Tubes and Water Tubes

Sectional Tube Expander

Preparation of Boiler Sheets for Tubing

Straightening of Tube-Sheets

Measuring Tube Length Between Tube-Sheets

Preparation of Tube Holes

Installation of Copper Ferrules

Tube Installation Processes

Swaging

Annealing Tubes

Setting Tubes in Tube-Sheets

Tube Expanding

Flaring Tubes

Beading

Welding Boiler Tubes to Tube-Sheets

Installation of Arch Tubes

Installation of Superheater Tube

Boiler Testing

Hydrostatic Test

Hydrostatic Test Pressure

Precautions When Making Hydrostatic Test

Stamping of Boiler

Examination Questions